📍 Noida, Ghaziabad, West Delhi 📞 +91 9217 9217 11
⚙️ Karigar Ji Operations

Process & SOP Library

Official standard operating procedures, safety guidelines, and job process checklists to ensure 100% service consistency and technician safety.

🔍

Field Operations & Checklists

📋
Active

AC Technician Job Process Checklist

Standard 5-step SOP for on-site technicians: 1. Tool Check, 2. Verify Complaint, 3. Verify Pricing, 4. Share Photos & Videos, 5. Report Items Used with visual diagnostic infographics.

5-Step SOP Infographic
View Checklist →
🛢️
Active

AC Refrigerant Cylinder Refilling Process

Workshop safety checklist for cylinder hydro-test validation, deep vacuuming, liquid phase scale transfer (80% safe cap), leak scans, and log recordkeeping.

Checklist Technical
View SOP →
🔧
Coming Soon

Split AC Installation SOP

Standard mounting measurements, indoor unit alignment, piping flares preparation, system vacuuming guidelines, and outdoor bracket security checks.

Technical Installation
Planned
🪟
Coming Soon

Window AC Installation Standard

Standard operating procedures for mounting window units, building secure frames, insulating side gaps, and adjusting water drainage tilt.

Technical Window AC
Planned

Safety & Hazard Management

🛡️
Coming Soon

PPE & Hazard Prevention Rules

Mandatory guidelines for working at heights, dealing with live wiring, checking current draw safely, and eco-friendly gas-handling protocols (R32/R410A).

Safety PPE
Planned
🚨
Coming Soon

Site Emergency Procedures

Standard actions for electrical short-circuits, refrigerant burns, physical slips, customer disputes, and first-aid response guidelines.

Safety Emergency
Planned

Customer Service & Quality Standards

💬
Coming Soon

Customer Interaction & Etiquette

Guidelines for professional greeting, presenting digital estimates upfront, addressing customer doubts, and collecting reviews politely.

Quality Etiquette
Planned
Coming Soon

Post-Service Audit Guidelines

Parameters for inspecting quality of work, checking cooling standards post-cleaning, measuring current drawing efficiency, and managing warranty claims.

Quality Audit
Planned